06/03/2016 – Passmore
The painters arrived on time each day between 8/8.30am. The first day, the
prep’d all the rooms and painted all walls/rooms except the feature wall in the
spare room. All painting was completed by lunch time the following day. All painting looks great. The job was performed professionally and carefully.
Painting – Interior